SCOPE OF THE PROJECT

Investigation, Survey, Design, Preparation of Detailed Engineering, Approvals, Manufacturing, Supply, Delivery, Erection, Commissioning and Maintenance of Water Supply Scheme.

Intake Well / Raw Water Pumphouse

  • Manufacture, Supply, Erection and Commissioning of Vertical Turbine pumpset with Discharge of 1020 LPS with Head of 40 mts 2 Nos.
  • Manufacture, Supply, Erection and Commissioning of Pump Control Valve, suitable size PN 1.0 at KP Canal 3 Nos.
  • Supply, Erection and Commissioning of Surge Vessel at Municipal Park Pumping Station.

WTP / Clear Water Pumphouse

  • Manufacture, Supply, Erection and Commissioning of Vertical Turbine pumpset with Discharge of 1020 LPS with Head of 40 mts 2 Nos.
  • Manufacture, Supply, Erection and Commissioning of Pump Control Valve, suitable size PN 1.0 at KP Canal 3.
  • Supply, Erection and Commissioning of Surge Vessel at Municipal Park Pumping Station.

Air Management system

  • Supply, Erection and Commissioning of Suitable Air Management system.
  • Supply, Erection and Commissioning of Anti-vacuum Air valves along the pipeline at suitable locations.
  • Supply, Erection and Commissioning of Surge Arrestor Air valves along the pipeline at suitable locations.

Reservoir Management System

  • Supply Erection and Commissioning of Reservoir Management system to control the flow as per the demand to facilitate uniform distribution of water to the ELSRs.
  • Supply Erection and Commissioning of Flow rate cum Float Control valve to control the flow as per the demand to facilitate uniform distribution of water to the ELSRs.

Water Management District

  • Supply Erection and commissioning of WMD system which should be able to control the flow as per demand to facilitate uniform. Distribution of water to the consumer irrespective of its location – 7 Nos (places).

Instrumentation and SCADA

  • Centralized monitoring and control of essential, parameters such as Levels, flow, Pressure, Temperature, Electrical parameters etc., confirming to relevant codes. All the SCADA systems providing at the individual stations should be able to be integrated and all the required data shall be displayed at a selected centralized monitoring stations for ????????????
error: Content is protected !!

EMPLOYEE LOGIN FORM

Existing Users Log In
   

Vendor Feedback Form

captcha

Service Request Form

captcha

Customer Feedback Form

captcha

ENQUIRY / FEEDBACK FORM

captcha

Fill the form to download PDF

captcha